Weidendom — Marcel Kalberer & Sanfte Strukturen, Gesäuse

The first Weidendom in Gesäuse National Park, Austria, in May 2014: arches of living willow bundles in fresh leaf stand over white canvas roofs on a lawn, with a gravel path in front and a rocky, forested mountainside behind
Artwork FileAdmont, Austria

Weidendom

StandingNov 2026

Marcel Kalberer & Sanfte Strukturen · Gesäuse National Park visitor center, Admont, Austria · 2004, replanted 2025

Photo: Ewald Gabardi / Wikimedia Commons (CC BY-SA 3.0), camera date 5 May 2014, as published on Street Art Utopia. It shows the first dome, which was replaced by a new one in April 2025.

The Weidendom (willow dome) is a building of living willow at the Gesäuse National Park visitor center, on the Enns river at the turn-off to Johnsbach near Admont in Styria, Austria. Swiss-born architect Marcel Kalberer planned it with park staff in winter 2003/04, and he and the Sanfte Strukturen team built it with volunteers, schoolchildren, state forestry workers and park staff from 3 to 21 May 2004. After more than 20 years of wind, heavy snow and willow borers, his daughter Anna Kalberer and Sanfte Strukturen planted a new dome in its place in April 2025. Source Source Source Source Checked

Standing Nov 2026: the newest contribution to the park’s Chronolog photo point is dated 5 November 2026 in the site’s data, and the final frame of its time-lapse shows the new dome’s leafless willow arches standing in late fall. Our photo, from 5 May 2014, shows the first dome. The park’s 2026 folder says of the Weidendom: “Im April 2025 wurde er komplett erneuert” (In April 2025 it was completely renewed), so the dome you find there today is the replanted one. A search on 10 November 2026 found no newer dated evidence. Source Source Source Checked

More photos

Inside one of the willow domes of the first Weidendom in Gesäuse National Park, 2014: thick bundles of living willow rods arch around a white canvas canopy hung over a wooden table and benches on gravel
2014 Inside one of the willow domesPhoto: Ewald Gabardi / Wikimedia Commons (CC BY-SA 3.0)
A row of pointed arches made of bound living willow bundles in fresh leaf forms a tunnel over a white gravel path at the Weidendom in Gesäuse National Park, 2014, with a rock face and conifers behind
2014 Willow arches over a pathPhoto: Ewald Gabardi / Wikimedia Commons (CC BY-SA 3.0)
Panorama of the first Weidendom in Gesäuse National Park in June 2020: its willow domes have grown into tall, dense green masses that hide the arches, on a lawn with paths, a swing and a viewing telescope below a forested rock face
2020 Grown dense, before the 2025 rebuildPhoto: Daniel Kraft / Wikimedia Commons (CC BY-SA 3.0)

💡 4 things to know

  1. Planned by a willow-building pioneer
    The park’s fact sheet says Marcel Kalberer, born in Switzerland in 1960, developed the technique of “living willow rod construction” in 1988 and planned the Weidendom with park staff in winter 2003/04. The builders’ own project page lists him among six project leads, with Dorothea Kalb-Brenek, Bernadette Mercx, Peedy Evacic, Jacky Roland and Philippe Rohner. Source Source Checked
  2. Three weeks in May 2004
    Sanfte Strukturen gives the build as 3–21 May 2004. Volunteers, schoolchildren, Styrian State Forest workers and park staff helped, and each willow bundle went into a planting hole up to 1.20 m deep. Before the build, the park’s spring 2004 magazine thanked Vienna’s forestry office for thousands of rods from old pollard willows in the Vienna part of the Donau-Auen National Park. Source Source Source Checked
  3. Worn out, then replanted in 2025
    On 21 April 2025 the park wrote that after more than 20 years “Wind, Schneedruck und der Weidenbohrer haben an seiner Substanz gezerrt” (wind, snow pressure and the willow borer have tugged at its fabric). In the first weeks of April, Anna Kalberer and Peedy Evacic of Sanfte Strukturen built the new dome with park staff, volunteers and the Junior Rangers; the park’s Martin Hartmann said Kalberer’s daughter Anna and his grandson planted it. A photo caption adds that the new structure was meant to carry heavier snow loads. Source Source Checked
  4. Cinema and a press conference under willow
    The park’s free summer program in July and August includes “Kino im Weidendom”, films under the open sky, and in 2023 it ran its tenth summer of cinema at the Weidendom. On 29 May 2026 the Gesäuse’s first joint summer press conference met “in den neu gestalteten Weidendom” (in the newly redesigned Weidendom). Source Source Checked

📍 Where it is

On the bank of the Enns at the turn-off to Johnsbach, in Gesäuse National Park near Admont, Styria, Austria. The park says the area is open all year, with staffed programs from May to October. Its website gives Krumau 97, 8911 Admont for satnavs, while its April 2026 folder gives Krumau 62. The map point is the OpenStreetMap outline of the Weidendom. Source Source Source Checked Our own check on 10 November 2026: Google Street View (July 2026) passes on the road, but trees hide the dome.

🗓️ Sightings

  1. 2004May

    Built 3–21 May · Sanfte Strukturen

  2. 200430 Jul

    Workshop inside opens · park magazine

  3. 201429 Apr

    Ten years growing · park press release

  4. 20145 May

    Photo of the first dome (Commons)

  5. 202022 Jun

    Photo: grown dense (Commons)

  6. 202521 Apr

    New dome planted · park press release

  7. 202525 Apr

    Rebuild finished · MeinBezirk

  8. 202629 May

    Press conference in the dome · Gesäuse press release

  9. 202617 Jun

    Minister visits before the opening · MeinBezirk

  10. 20265 Nov

    Photo: new dome, leafless arches (Chronolog)

Green stamps mark dated photographs; amber stamps mark records or reports; red stamps mark loss. Publication dates are not camera dates.

✅ The facts

Makers
Marcel Kalberer and the Sanfte Strukturen team, with Gesäuse National Park staff Source Source Source Checked
2025 dome
Anna Kalberer and Peedy Evacic of Sanfte Strukturen, with park staff, volunteers and the Junior Rangers Source Source Checked
Title
Weidendom (German for “willow dome”); the park’s English material calls it the Willow Dome Source Source Checked
Designed
Winter 2003/04 Source Checked
Built
3–21 May 2004 Source Source Source Checked
First-dome year
The park’s April 2025 press release quotes Martin Hartmann: “2005 errichtete der Weidenbaupionier Marcel Kalberer unseren ersten Weidendom” (in 2005 willow pioneer Marcel Kalberer built our first Weidendom). We lean to 2004: the builders’ record, the park’s fact sheet, its autumn 2004 magazine and Ö1 all give May 2004, and in April 2014 the park said the dome had been growing for ten years Source Source Source Source Source Source Conflicting
Opened
The research workshop inside opened on 30 July 2004, at the “lange Nacht des Weidendoms” (long night of the Weidendom) Source Checked
Floor area
About 300 m² of event space under several main and side domes (first dome, 2004) Source Source Checked
Domes
Five tower-like domes, the largest 8 × 6 m in plan and 9 m high, according to Ö1 (first dome) Source Reported
Willows
White willow, osier, hybrid crack willow and purple willow (first dome); no source lists the 2025 dome’s willows Source Checked
Rebuilt
First weeks of April 2025 Source Source Source Checked
Size claim
Called “das größte lebendige Bau(m)werk des Alpenbogens” (the largest living building of the Alpine arc) by the park in 2014 and Austria’s largest living building in 2004; Styrian tourism’s cycling site repeats “the largest living construction in the Alps” Source Source Source Reported
2026 changes
In 2026 the park called the dome “neu gestaltet” (newly redesigned) and spoke of a “Weiterentwicklung” (further development); its news item of 15 June 2026 says the minister visited “noch vor der offiziellen Eröffnung” (before the official opening). MeinBezirk’s headline called it “erweitert” (expanded). No source we found says what was added, who did the work or when the opening took place Source Source Source Unconfirmed
Address
Krumau 97, 8911 Admont (park website, for satnavs) or Krumau 62, 8911 Admont (park folder, April 2026). Both come from the park; we lean to the newer folder Source Source Conflicting
Access
Open all year; staffed program May to October, 10:00–18:00 on set days Source Checked
Run by
Gesäuse National Park, as its Weidendom visitor center Source Source Checked

🔗 Related

All sources & image credits

Last checked: 10 November 2026. How we verify art