Castro Rainbow Crosswalks — Castro/Upper Market CBD, San Francisco

Rainbow-striped crosswalks crossing the intersection of Castro and 18th Streets in San Francisco on a sunny day, with Harvey’s bar on the corner, a black SUV crossing the stripes and trolleybus wires overhead
Artwork FileSan Francisco, USA

Castro Rainbow Crosswalks

SeenJan 2026

Castro/Upper Market Community Benefit District · 2014 · 18th & Castro, San Francisco

Photo: Mike McBey / Wikimedia Commons (CC BY 2.0), 8 June 2015, as published on Street Art Utopia. Commissioned and largely paid for by the Castro/Upper Market Community Benefit District; designer not named in the sources.

Four crosswalks of thin parallel rainbow stripes mark the corner of 18th and Castro streets in San Francisco’s Castro District. The design was unveiled on 13 March 2014 at the groundbreaking of the Castro Street redesign, after an online poll of more than 4,500 Castro residents and visitors, and the crosswalks were largely funded by the Castro/Upper Market Community Benefit District. Source Source Source Checked CBS called the crosswalk newly installed on 1 October 2014. Source Reported

Seen Jan 2026: a dated Wikimedia Commons photo of 31 January 2026 shows a trolleybus crossing the rainbow crosswalk on Castro Street. We found no news report from 2017 onwards on the crosswalks’ condition. Source Checked

More photos

Close-up of the Castro rainbow crosswalk in October 2014: dozens of thin parallel stripes in red, orange, yellow, green, blue and purple inlaid in dark asphalt
2014 The new stripes, close up, October 2014Photo: Burkhard Mücke / Wikimedia Commons (CC BY-SA 4.0)
The rainbow crosswalk at 18th and Castro in August 2016: curving stripes in rainbow colours running across the asphalt between white lines, with only the feet of people waiting on the corner visible
2016 August 2016, after the May damagePhoto: Tobias Kleinlercher / Wikimedia Commons (CC BY-SA 3.0)

💡 5 things to know

  1. Picked by a public voteThe parallel-stripe design was chosen from four options in a vote of about 4,500 people; KQED says it was the favourite of 4,500 votes cast online and in person, though not everyone in the neighbourhood liked it. CBS later said more than 4,000 people voted. Source Source Source Source Checked
  2. Paid for by local merchantsThe Castro/Upper Market Community Benefit District agreed to fund the four decorative crosswalks; ABC7 reported the district’s merchants were paying about $37,000, inside a $4.5 million city-funded streetscape project. Source Source Reported
  3. Subtler than West HollywoodBefore installation, ABC7 reported the design was expected to be a more subtle, sophisticated version than the rainbow crosswalks then on the streets of West Hollywood. Source Reported
  4. Hidden for a TV shoot, then damagedIn May 2016 a crew filming the ABC miniseries When We Rise covered the stripes to hide them; when the covering was pulled up, adhesive left black gunk that power washing could not remove. Source Source Source Checked
  5. ABC pledged to pay for new stripesSFist reported the crosswalks would be regraded and re-laid on 19 and 20 September 2016, with a drainage fix by the original contractor under warranty; the production pledged to pay for the replacement. Source Source Reported

📍 Where it is

At the corner of Castro Street and 18th Street in the Castro District, San Francisco; all four crosswalks of the intersection carry the stripes, according to SFist. Source Source Source Checked

Opens a map at the 18th and Castro intersection; the point is the camera location of the geotagged January 2026 Commons photo.

🗓️ Sightings

  1. 201413 Mar

    Design unveiled · Streetsblog SF

  2. 20141 Oct

    Newly installed · CBS San Francisco

  3. 201413 Oct

    Photo of the new stripes · Wikimedia Commons

  4. 20158 Jun

    Photo of the corner · Wikimedia Commons

  5. 201616 May

    Damaged by a TV shoot · SFist

  6. 201628 Aug

    Photo before the re-laying · Wikimedia Commons

  7. 201613 Sep

    Re-laying set for 19–20 Sep · SFist

  8. 202631 Jan

    Photo with a trolleybus · Wikimedia Commons

Green stamps mark dated photos of the crosswalks; amber stamps mark reports. Publication dates are not camera dates.

🗞️ In the sources

KQED15 Mar 2014

San Francisco Breaks Ground on Colorful Castro Street Redesign

“parallel rainbow stripes had been chosen to grace the crosswalks at 18th and Castro streets”

Announced by the Castro Community Benefit District at the groundbreaking.

Read the source →

CBS San Francisco1 Oct 2014

SF Castro District Streets Get Splash Of Color With Rainbow Crosswalks

“A newly installed rainbow crosswalk is the latest colorful addition to San Francisco’s Castro District.”

The first report of the finished crosswalks; residents had mixed feelings.

Read the source →

SFist16 May 2016

Film Shoot Damages Castro’s Rainbow Crosswalks

“The Castro’s rainbow crosswalks were damaged last week during the filming of an ABC miniseries”

The miniseries was When We Rise.

Read the source →

✅ The facts

Commissioned by
Castro/Upper Market Community Benefit District, which agreed to fund the four decorative crosswalks Source Source Source Checked
Designer
Not named in the sources we found Unconfirmed
Location
The four crosswalks at the intersection of Castro Street and 18th Street, Castro District, San Francisco Source Source Source Checked
Design
Parallel rainbow stripes, chosen from four options in a vote of about 4,500 people (CBS: more than 4,000) Source Source Source Source Checked
Unveiled
13 March 2014, at the groundbreaking of the Castro Street redesign Source Source Source Checked
Installed
Autumn 2014. SFist later said they were installed in September 2014 (“two years ago this month”, September 2016); on 1 October 2014 CBS called the crosswalk newly installed, while ABC7 said workers were putting on the finishing touches and the job was scheduled to be finished the next month Source Source Source Conflicting
Project
Part of the $4.5 million Castro Street streetscape project, the first funded by the 2011 street repair bond Source Source Source Checked
Cost
About $37,000, paid by the merchants of the Community Benefit District, according to ABC7 Source Reported
Material
Inlaid coloured asphalt, according to SFist Source Reported
Damaged
May 2016, during filming of the ABC miniseries When We Rise Source Source Source Checked
Re-laid
Scheduled for 19–20 September 2016, paid for by the production Source Source Reported
Status
Photographed on 31 January 2026 Source Checked

🔗 Related

All sources & image credits

Last checked: 7 November 2026 · How we verify art